Army Corps Project – Manville

The Millstone River Basin Flood Control and Ecosystem Restoration Study

Current Status:       Pending Final Report Approval

Project Manager:   Robert M. Greco

Fact Sheet from the Army Corps of Engineers

Project History:

Millstone River Basin Feasibility Study (pdf)

Federal Register, Vol. 67, No. 211 (Oct 31, 2002)

Draft Feasibility Report Webpage http://www.nan.usace.army.mil/

Flood Risk Management Feasibility Study (USACE) – RMRFCC Presentation – March 23 2016

RMRFCC Response Letter to US Army Corps Study – Final

Press Release – US Army Corps Turns Back on Manville

RMRFCC Response Letter 22 Dec 2016 from USACE